Analisa Meningkatnya Rugi-Rugi Daya Akibat Jatuh Tegangan Pada Proses Transmisi 150 KV Maligi-Indoliberty

JE-Unisla

View Archive Info
 
 
Field Value
 
Title Analisa Meningkatnya Rugi-Rugi Daya Akibat Jatuh Tegangan Pada Proses Transmisi 150 KV Maligi-Indoliberty
 
Creator Ismawan, M Haikal
Santoso, Dian Budhi
 
Subject Teknik Elektro
Electrical energy, Transmission, Voltage drop, Power loss

 
Description  Tariffs are one of the driving forces of the economy, so electrical energy providers should be more effective in presenting electrical energy so that the basic electricity tariffs can be cheaper, one way is to reduce power losses in the transmission process. power losses arise because the transmission conductor has resistance values, power losses can increase if the voltage in the transmission system decreases, in the case study taken at PT PLN (Persero) UPT Karawang Gardu Induk (GI) 150 KV maligi the direction of the conductor Indoliberty 150 KV transmission when the average load in one day is 18.85 MW and 10.01 MVAr there is a power loss of 7065.05 W in one day when the voltage is 150 KV, and power losses increase by 411.17 W when there is avoltage drop of 2.8766% from a voltage of 150 KV to 145.82 KV which increases the cost loss of Rp. 9838,396 per day.
 
Publisher Universitas Islam Lamongan
 
Contributor Prodi Teknik Elektro Universitas Islam Lamongan
 
Date 2021-09-20
 
Type info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion



 
Format application/pdf
 
Identifier https://jurnalteknik.unisla.ac.id/index.php/elektronika/article/view/690
10.30736/je-unisla.v6i2.690
 
Source JE-Unisla; Vol 6, No 2 (2021); 14-18
JE-Unisla; Vol 6, No 2 (2021); 14-18
26860653 http:/
25020986 http://
 
Language ind
 
Relation https://jurnalteknik.unisla.ac.id/index.php/elektronika/article/view/690/464
 
Coverage


 
Rights ##submission.copyrightStatement##
https://creativecommons.org/licenses/by-nc/4.0