Record Details

ANALISIS STRUKTUR LAPISAN BAWAH PERMUKAAN DENGAN METODE GEOLISTRIK DALAM PERENCANAAN PONDASI

Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan

View Archive Info
 
 
Field Value
 
Title ANALISIS STRUKTUR LAPISAN BAWAH PERMUKAAN DENGAN METODE GEOLISTRIK DALAM PERENCANAAN PONDASI
 
Creator Nugroho, Meriana Wahyu
Farida A, Fatma Ayu Nuning
Maya, Khodijah
 
Subject Teknik Sipil
layer structure, geoelectric, resistivity, foundation
Teknik Sipil
 
Description The purpose of this study was to determine the structure of the subsurface at construction site Campus Rector Building B University Hasyim Ashari. Information subsurface structure used as the initial study foundation design. The research was carried out with resistivity geoelectric method using a resistivity meter. Interpretation of the track point J.01 - J.02 - J.03 known subsurface water dominated by basalt rocks, and discovered the hard ground at a depth of 12 m for planning the foundation beams, while on the track J.04 - J.02 - J.05 dominated by conglomerates and basalt rocks, and discovered the hard ground at a depth of 7 m to pile foundation design.
 
Publisher Litbang Pemas - Universitas Islam Lamongan
 
Contributor
 
Date 2018-10-16
 
Type info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion


 
Format application/pdf
 
Identifier https://jurnalteknik.unisla.ac.id/index.php/CVL/article/view/262
10.30736/cvl.v3i2.262
 
Source Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan; Vol 3, No 2 (2018): September; 186-191
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan; Vol 3, No 2 (2018): September; 186-191
2620-7222
2503-2399
 
Language ind
 
Relation https://jurnalteknik.unisla.ac.id/index.php/CVL/article/view/262/198
 
Rights Copyright (c) 2018 Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan
https://creativecommons.org/licenses/by-sa/4.0