Risk Analysis of Surabaya – Bojonegoro Highway Improvement Project Based on Fuzzy Logic
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan
View Archive InfoField | Value | |
Title |
Risk Analysis of Surabaya – Bojonegoro Highway Improvement Project Based on Fuzzy Logic
Risk Analysis of Surabaya – Bojonegoro Highway Improvement Project Based on Fuzzy Logic |
|
Creator |
Rodhi, Nova Nevila
|
|
Subject |
—
— — civil engineering - project management Bojonegoro-Surabaya highway KM107, Risk analysis, Fuzzy Logic risk management |
|
Description |
Infrastructure development is one of the efforts to improve the welfare of the community, but in its implementation, road construction projects have risks that can have an impact on the project as well as on the external side of the project. This research is a case study on the road widening project of Bojonegoro – Surabaya KM 107. The purpose of this research is to analyze the risks in the project using fuzzy logic. Based on the results of the analysis, it can be concluded that the Bojonegoro - Surabaya highway widening project has 10 risk factors, namely noise, air pollution, heavy equipment vibration, traffic accidents, congestion, reduced parking space, increased fuel consumption of road users, decreased income of people in surrounding locations, conflict between road users, covid 19. The results of the analysis using a risk matrix, all risk factors are at a moderate level, but the results of the analysis using fuzzy, there are 2 risks that are at a high level, namely traffic congestion and a decrease in people's income in surrounding locations.
Infrastructure development is one of the efforts to improve the welfare of the community, but in its implementation, road construction projects have risks that can have an impact on the project as well as on the external side of the project. This research is a case study on the road widening project of Bojonegoro – Surabaya KM 107. The purpose of this research is to analyze the risks in the project using fuzzy logic. Based on the results of the analysis, it can be concluded that the Bojonegoro - Surabaya highway widening project has 10 risk factors, namely noise, air pollution, heavy equipment vibration, traffic accidents, congestion, reduced parking space, increased fuel consumption of road users, decreased income of people in surrounding locations, conflict between road users, covid 19. The results of the analysis using a risk matrix, all risk factors are at a moderate level, but the results of the analysis using fuzzy, there are 2 risks that are at a high level, namely traffic congestion and a decrease in people's income in surrounding locations. |
|
Publisher |
Litbang Pemas - Universitas Islam Lamongan
|
|
Contributor |
—
Universitas Bojonegoro |
|
Date |
2022-03-15
|
|
Type |
info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion — — |
|
Format |
application/pdf
|
|
Identifier |
https://jurnalteknik.unisla.ac.id/index.php/CVL/article/view/789
10.30736/cvl.v7i1.789 |
|
Source |
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan; Vol 7, No 1 (2022): March; 57-64
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan; Vol 7, No 1 (2022): March; 57-64 2620-7222 2503-2399 |
|
Language |
eng
|
|
Relation |
https://jurnalteknik.unisla.ac.id/index.php/CVL/article/view/789/pdf
|
|
Rights |
Copyright (c) 2022 Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan
https://creativecommons.org/licenses/by-sa/4.0 |
|