Record Details

ANALISIS PREVENTIVE MAINTENANCE MESIN EXTRUSION DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) (Studi Kasus di PT. Lumina Packaging. Sidoarjo, jawa timur)

JISO : Journal of Industrial and Systems Optimization

View Archive Info
 
 
Field Value
 
Title ANALISIS PREVENTIVE MAINTENANCE MESIN EXTRUSION DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) (Studi Kasus di PT. Lumina Packaging. Sidoarjo, jawa timur)
 
Creator Rizani, M. Khoirul
 
Subject RCM II, FMEA, decision worksheet of RCM II, maintenance management.
 
Description ABSTRAK PT. Lumina Packaging adalah perusahaan yang bergerak di bidang pembuatan kemasan berbahan dasar plastik dengan alamat di Sidoarjo Jawa Timur. Saat ini, permasalahan yang dihadapi perusahaan adalah tingginya frekuensi kerusakan mesin. Hal ini, menyebabkan terhambatnya proses produksi dan biaya perbaikan mesin menjadi sangat tinggi. Salah satu penyebab utamanya adalah tidak adanya manajemen perawatan mesin yang diterapkan. Salah satu metode yang digunakan terkait perawatan mesin adalah reliability centered maintenance II (RCM II) dengan menggabungkan FMEA dan RCM II Decision Worksheet. Dari hasil penelitian ini, diperoleh biaya perawatan (CM) untuk komponen Extruder sebesar Rp. 8.645.830.168. Biaya tersebut, jauh lebih murah jika dibandingkan dengan biaya perbaikan (breakdown maintenance) (CF) yang sebesar Rp. 16.855.830.17. Sehingga dengan menerapkan perawatan mesin, perusahaan dapat menghemat biaya hingga lebih dari Rp. 7.782.496,19.ABSTRACTPT. Lumina Packaging is a company engaged in the manufacture of plastic-based packaging with an address in Sidoarjo, East Java. Currently, the problem faced by the company is the high frequency of machine breakdowns. This causes delays in the production process and the cost of repairing machines becomes very high. One of the main causes is the absence of machine maintenance management that is applied. One of the methods used related to machine maintenance is reliability-centered-maintenance II (RCM II) by combining FMEA and RCM II Decision Worksheet. From the results of this study, the maintenance cost (CM) for the Extruder component was Rp. 8,645,830,168. These costs are much cheaper than the breakdown maintenance (CF) costs of Rp. 16,855.830.17. So that by applying machine maintenance, the company can save costs up to more than Rp. 7,782,496.19. 
 
Publisher Universitas Maarif Hasyim Latif
 
Contributor Universitas Maarif Hasyim Latif
 
Date 2021-06-21
 
Type info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Peer-reviewed Article
 
Format application/pdf
 
Identifier https://e-journal.umaha.ac.id/index.php/jiso/article/view/953
10.51804/jiso.v4i1.20-29
 
Source JISO : Journal of Industrial and Systems Optimization; Vol 4, No 1 (2021): Juni 2021; 20-29
2622-898X
2622-8971
 
Language eng
 
Relation https://e-journal.umaha.ac.id/index.php/jiso/article/view/953/832
 
Rights http://creativecommons.org/licenses/by-sa/4.0